Intelligent Racking Retrofit Project for an E-commerce Warehouse
Ho Chi Minh City
Challenge
The client's e-commerce warehouse in Ho Chi Minh City originally spanned 800 square meters, with a space utilization rate of less than 40%. The traditional floor-stacking method resulted in extremely low manual picking efficiency, with a maximum daily throughput of only 500 orders, falling far short of peak season demands. Furthermore, disorganized cargo classification made inventory counting both time-consuming and labor-intensive.
Solution
Our company designed and installed a customized heavy-duty pallet racking system for the client, featuring a rack height of 6 meters and compatibility with narrow aisle electric forklifts. A total of 120 rack sections were installed throughout the warehouse, increasing storage density by 60% compared to the previous layout. Simultaneously, we optimized the slotting and location coding system and introduced a barcode scanning picking process, boosting daily order processing capacity to 1,500 orders. The project took 14 days from site survey to completion, with normal warehouse operations maintained throughout the construction period.